The Requirement
South Caldecote, Milton Keynes, Buckinghamshire is a 135-acre warehousing and distribution site close to a lake, planned to house 2.2 million square feet of cutting-edge buildings for specialist UK logistics and industrial property business PLP. On completion it will incorporate 17-acres of lowland meadows and 3.8 kilometres of pedestrian and cycle ways, which will integrated into the MK Red Way cycle network.
The entire site is designed to be highly sustainable with carbon net zero. This includes using PV solar panels, and low carbon concrete, cladding and steel.
Constrasol aluminium solar shading is installed at the entrances to the distribution units and the metal finish needed to exactly match a shade of cyan paint already used as a feature band running at mid-height around the units.