The Requirement
Mustard Wharf, in the heart of Leeds, is a Build to Rent development comprising of 247 boutique apartments and ground floor retail units across three buildings, situated close to the historic Leeds and LIverpool canal. Architectural interior design company, Lister and Lister, worked closely with our client, Amron to design inspiring amenity spaces across the development. A central clubhouse was designed, providing residents with a variety of shared spaces connected by a dramatic steel plate staircase.
Expanded metal meshes in Zircon 45 and Zircon 60 were designed by Amron, for the stair soffits, and for balustrades within the Atrium space. The client wanted a finish that would retain the appeal of a metallic appearance. shade was chosen from Powdertech’s Anomatch™ range which resembles the sheen provided by anodising. One of the advantages that Anomatch has over anodising is that it provides an homogenous finish across different metal batches and joined sections. There are over twenty Anomatch shades from which the client chose ‘Regency Gold’. The staircase soffits and the balustrades are a stunning feature within this residential development.